PILED EMBANKMENT N207

Client: Bunnik bv
Location and Year: Bodegraven-Reeuwijk, 2014-2015
Features: Piled embankment
Project description

During the second phase of ‘Consensusboog Boskoop Oost’ a double lane roundabout is to be constructed in order to make connect the Randenburgseweg to the N207 through the Gouwedreef.
Arthe has been asked to make the complete design for a piled embankment for the roundabout, from initial sketch to construction drawings.

Proceedings

  • Geometrical design of the piled embankment
  • Calculations for load capacity of the piles
  • Structural design of the pile caps
  • Dimensioning the geotechnical reinforcement
  • Designing the transitions
  • PLAXIS-calculations for deformations and moment in the piles


Construction drawings:
  • Pile plan
  • Plan for the geotechnical reinforcement
  • Profiles of the work to be constructed
  • Drawing of the rebar for the pile caps